Page 433 - 4300 Catalog Cover.pdf

SEO Version

4300 Catalog
Assembly / Installation
Parker Hannifin Corporation
Tube Fittings Division
Columbus, Ohio
T23
Ferulok Assembly
Ferulok fitting assembly consists of the following steps:
1) Cutting, deburring and cleaning of the tube
2) Ferrule pre-set
3) Pre-set inspection
4) Installation
Step 1 (cutting, deburring and cleaning of the tube) has been
previously covered (se
For the recommended minimum and maximum tube wall thick-
ness for Ferulok fittings, please refer t
n page D5.
Ferrule Pre-set
Prior to final installation, the Ferulok fitting requires a pre-setting
operation that creates a bite by the ferrule into the outer surface
of the tubing. Pre-setting can be accomplished by two different
methods: hydraulically using a Hyferset Tool or a Hydra-Tool, or
manually using a hardened Ferulset tool or the fitting body.
Prior to pre-setting, determine the tube length allowance “A”
usin
Pre-setting using Ferulset Tool or Fitting Body
*No additional lubrication is required with stainless steel fittings as the nuts are
pre-lubricated.
Table T22 —Tube
length allowance
Fig. T32 —Tube length allow-
ance
Step 1 –
Lubricate thread
and cone of Ferulset Tool
(or fitting body).
Step 2 –
Slip nut and ferrule
over deburred tube end. Be
sure the long, straight end of
the ferrule points toward tube
end.
Step 3 –
Lubricate ferrule with
system fluid or a compatible
lubricant.
Step 4 –
Bottom tube end
firmly on internal shoulder of
Ferulset Tool (or fitting body).
Step 5 –
Manually screw nut
onto Ferulset Tool or fitting
body until finger tight.
Step 6 –
Make reference
mark on nut and tube.
Step 7 –
Hold tube steady
against internal shoulder of
Ferulset Tool or fitting body
and tighten nut an additional
1-3/4 turns.
Step 8 –
Loosen nut and
check for proper pre-set.
Use the following inspection
criteria.
Ferulset pre-setting tools made from hardened steel are
available for sizes 2 through 32. (Se
They are
recommended over the fitting body because they can be used
repeatedly to perform the pre-set operation.The fitting body can
be used only once for pre-setting and should be used during
final installation with the pre-set tube line. The following steps
are required for proper pre-set of the ferrule using the Ferulset
tool or fitting body.
Ferulok Assembly
Dimensions and pressures for reference only, subject to change.
Nominal
Tube
O.D.
A
1/8
0.19
3/16
0.23
1/4
0.23
5/16
0.25
3/8
0.25
1/2
0.31
5/8
0.35
3/4
0.35
7/8
0.35
1
0.42
1 1/4
0.42
1 1/2
0.49
2
0.49