Parker Hannifin Corporation
| Parflex
®
Division | Ravenna, Ohio
For detailed ordering information, please consult price list or contact Parflex
®
Division.
G-24
SQ-Swage Instructions
Sewer Hose
Fittings –
Visually inspect fitting
for properly crimped shells,
internal barbs, a through-hole
and damage.
1
Inspection
Hose –
Visually inspect both
ends of hose for square cut.
Remove any burrs, loose fibers
or wires.
2
Assemble hose –
Push each
hose end into fitting to the depth
insertion mark.
Lubricate –
Using an SAE 20
weight oil, lightly lubricate inside
of both hose ends.
Assembly
I
nsertion Depth –
Mark hose
end with proper insertion depth
line.
3
Place hose and fitting assembly
into position on swager.
Remove both die securing bolts
and nuts.
Assembly
CAUTION:
There are several different sections for Hose Assembly
and Crimping. Be sure you are in the section that corresponds to
the fitting series you are using.
Se
for listing.