Page 70-71 - LT_3722_v8_MRO.qxp

SEO Version

HEAVY DUTY
STRENGTHEN KEYED ASSEMBLIES
17
ASSEMBLY
1.
Clean all parts with Loctite
® ODC-Free Cleaner & Degreaser.
2.
Apply a Loctite®
660™
Quick M
etal® Retaining Compound coating
around shaft, into keyway, and o
n key.
3.
Assemble parts.
Wipe off excess.
4.
Apply a Loctite®
660™
Quick Metal® Ret
aining Compound dab to screw.
5.
Tighten set screw.
6.
Allow 30 minutes prior to service.
Note:
If gap exceeds .005", use Loctite®
7649™
P
rimer N™ on
appropriate area (shaft or keyway).
Loctite®
660™
Quick Metal® Retaining Compou
nd is NOT
recommended for radial gaps exceeding .010" on
shaft
or keyway.
See REPAIRING BADLY WALLOWED KEYWAY for procedu
re
page 18.
DISASSEMBLY
1.
Tap component and key with hammer.
2.
If necessary, apply localized heat (450°F for five minutes).
3.
Pull while hot.
660
Quick Metal
®
Coating Here
Dab 660
Quick Metal
®
or 2440
here